Tanzania – ACSR Conductors + Insulators for Rural Electrification Projects (REA Phase IV)

In 2023–2024, Uni-Cable was awarded contracts to supply ACSR overhead conductors and porcelain/polymer insulators to support Phase IV of Tanzania’s Rural Electrification Program (REA). Managed by the Rural Energy Agency in cooperation with TANESCO (Tanzania Electric Supply Company), this project aimed to connect over 1.5 million households to the national grid across more than 80 districts, especially in Dodoma, Singida, Tabora, and Kigoma.

The project required cost-effective, durable overhead transmission materials capable of withstanding East African climate conditions, such as high UV exposure, rainfall, and variable terrain.

Products Supplied

1. ACSR Conductors

Conductor Type Size Aluminum/Steel Rated Strength Standard
ACSR 25mm² 6/1/2.10 mm 6 Al / 1 St 6.7 kN IEC 61089
ACSR 50mm² 6/1/2.89 mm 6 Al / 1 St 10.5 kN IEC 61089
ACSR 100mm² 6/1/3.76 mm 6 Al / 1 St 18.5 kN IEC 61089
ACSR 150mm² 30/7/2.25 mm 30 Al / 7 St 39.5 kN IEC 61089
  • Grease-filled core for corrosion protection (for 100 mm² and above)

  • Annealed aluminum for flexibility during installation

2. Insulators

Type Material Voltage Rating Creepage Distance Standard
Pin Type Porcelain 11kV / 33kV 320mm / 550mm IEC 60383
Disc Type Porcelain 33kV / 66kV 430mm+ IEC 60383
Long Rod Polymer (Silicone) 11kV / 33kV 400–650mm IEC 61109
  • UV-resistant polymer insulators for coastal and dusty regions

  • Hot-dip galvanized end fittings

  • All insulators passed mechanical and electrical load tests

Application & Scope

The supplied conductors and insulators were used in:

  • 11kV and 33kV overhead line construction from rural substations

  • Grid extension to schools, health centers, water supply stations, and villages

  • Feeder and sub-feeder lines up to 50 km

  • Replacement of damaged insulators in maintenance programs

The conductor sizes were selected based on load forecast, span length, terrain, and cost-efficiency for rural areas with low load density.

Quality Inspection & Certification

All products were inspected and tested according to IEC and TANESCO standards, with third-party pre-shipment inspection carried out by SGS Tanzania and a local agent assigned by the Ministry of Energy.

Tests performed:

  • Conductor tensile strength, elongation, and wrapping

  • Insulator mechanical failing load test (70kN for disc types)

  • Electrical withstand tests (wet & dry)

  • Galvanization thickness and adhesion test

  • Packaging vibration and drum rotation simulation test

Certificates of Conformity (CoC) were issued to clear the goods through Tanzanian import channels.

Packaging & Delivery

  • ACSR conductors: Supplied in wooden export-grade drums (500m–1,000m each), each with labeled serial numbers and conductor specs

  • Insulators: Packed in reinforced crates with separators and shock protection

  • Shipping method: Sea freight to Dar es Salaam Port

  • Lead time: 30 days from order to delivery

Shipment documents included:

  • Commercial Invoice

  • Packing List

  • Certificate of Origin

  • Inspection Certificate

  • Test Reports

  • Material Safety Data Sheets

Uni-Cable Advantages in the Project

Full product range: Conductors + insulators + tension/suspension fittings supplied from one source
Fast turnaround: Manufacturing and shipment completed within 4 weeks
Climate-adapted design: Polymer insulators with extra UV protection
Compliance-ready: Products met TANESCO specifications without need for redesign
Cost-effective packaging: Maximized load per container to reduce shipping cost per km

Accessories & Matching Hardware

Also supplied to contractors for line installation:

  • Suspension clamps

  • Tension clamps

  • Insulator pins and crossarms

  • Bolts, nuts, and galvanized steel brackets

  • Guy wires and stay rods

Impact & Feedback

“The installation process was smooth, with no product failures. Packaging and documentation were excellent. We are planning to specify Uni-Cable in upcoming Phase V tenders.”

Contractors noted reduced wastage and easy handling of polymer insulators in remote areas where manual installation was the norm.